Rudder Wrap-up
Put the final touches on the rudder today. Everything went smoothly and the Trailing Edge tape was no big deal. Pop riveting the two halves was really a lot of fun. Rolling the leading edges was probably my least favorite task. Just too much vagueness in the pipe rolling and the templates from the plans. I prefer things that go together perfectly with no ambiguity. Leading edges like this seem like the intention is to get a nice even curve not something specific.
The one replacement stiffener is primed with spray can primer so it stands out. Super convenient for places that won't show but aren't enough to pull out the Akzo setup.
Looks straight to me. Still a 2x4 with dive weights for a couple days makes sure it sticks before riveting.
Some of the big rivets on the horn are a bit pinched. Part of me wants to do them over and part of me wants to live with it. Should be good enough and drilling out risks doing more damage. I'm leaving them for now but I might change my mind later.
Comments
Post a Comment